HomeSolar Power (EPC)
Clean Energy Solutions

Solar Power EPC Services
in Mathura, Agra & UP

Turnkey solar EPC solutions for residential, commercial, and industrial clients across Mathura, Agra, and Uttar Pradesh. Government subsidy assistance included. 25-year panel warranty. Starting ₹38,000/kWp.

25-Year Panel WarrantySubsidy AssistanceNet Metering SupportFree Site Survey4–6 Yr ROI
Call Us Now

5 MW+

Solar Installed

25 Yr

Panel Warranty

4–6 Yr

ROI Period

500 kWp

Largest Project

Solar EPC installation by V Plus Infra Services Mathura

Our Solar EPC Services

End-to-end solar solutions from survey and design to commissioning and AMC

On-Grid Solar Systems

Grid-tied solar installations with net metering for homes, factories, and commercial buildings. Save up to 90% on electricity bills.

Off-Grid & Hybrid Systems

Battery storage integrated systems for areas with unreliable grid supply. Complete power independence.

System Design & Load Analysis

Site survey, shadow analysis, load calculation, and optimized system design using industry-standard software.

Net Metering & Grid Integration

Complete UPPCL net metering application, approval support, and smart bidirectional meter installation.

Rooftop & Ground-Mounted

Both rooftop structure mounting and open land ground-mounted solar installations for all scale requirements.

Govt. Subsidy Assistance

Complete assistance for PM Surya Ghar Muft Bijli Yojana and state subsidy applications to reduce upfront cost.

Annual Maintenance (AMC)

Panel cleaning, inverter health checks, performance monitoring, and replacement under comprehensive AMC packages.

Remote Performance Monitoring

Wi-Fi/GPRS based real-time monitoring systems with mobile app access showing generation, savings, and alerts.

Solar Installation Process

From free site survey to fully commissioned system — usually in just 3–7 days

01

Site Assessment

On-site survey covering rooftop area, shadow analysis, existing load, and grid connection point.

02

System Design

Panel sizing, inverter selection, string design, and single-line diagram prepared by our solar engineers.

03

Subsidy & Approval

DISCOM feasibility approval, net meter application, and subsidy documentation handled by our team.

04

Procurement

ALMM listed panels, Tier 1 inverters, and BIS certified components procured from verified suppliers.

05

Installation

Structure erection, panel mounting, wiring, and inverter installation completed in 3–7 days.

06

Commissioning

Final testing, net meter installation, system walkthrough, monitoring setup, and 25-year warranty documents.

Starting From

₹38,000 /kWp

Installed · Govt. subsidy applicable for eligible consumers

Government subsidy up to ₹78,000 available — we handle the entire process

Call for Pricing

Solar Energy FAQs

Explore our other service categories

Talk with Us